Part of The Pickstock Group - Click to visit

Pickstock Construction

Contact Information

Pickstock Construction

The-Pickstock-Group-Provides-Turn-Key-Student-Scheme-in-Colchester
02 August 2013

The Pickstock Group Provides Turn Key Student Scheme in Colchester

Work has commenced on a 779 bedroom student accommodation scheme in Colchester which sees The Pickstock Group do what they do best, in offering a complete turnkey solution.

 

The Pickstock Group, based in the West Midlands will utilise businesses within their Group to complete the project. Pickstock Construction, the Groups building contractor will drive the build and the Groups off-site building solutions business Elements Europe will be pivotal in the project with the off-site build of 779 student Room Pods. This project will be the largest student accommodation scheme that Elements Europe have been involved in using the full volumetric Roompod system. Elements Europe also specialise in Pods for the Hotel, Health Care, Residential and Defence sectors.

 

Andy Jones Managing Director of The Pickstock Group says “The expertise we can draw from the different businesses in our Group enables us to offer our clients the very best service. From land acquisition right through to the snagging list, we manage the whole process resulting in an outstandingly efficient build. The client also benefits from cost efficiencies and the project is completed with exacting quality and standards that we strive for throughout the whole Group”.

 

The student scheme on King Edwards Quay in Colchester comprises 779 student rooms across eight floors. The development offers two types of accommodation, studio apartments and student cluster rooms. There will also be a shop, bar and spacious communal areas both internally and externally. The accommodation which overlooks the River Colne will provide residents with easy access to both Essex University’s Colchester Campus and Colchester town centre.

 

The scheme has been carefully planned with The Pickstock Group working closely with their client.

 

The construction programme of the Colchester student accommodation scheme will be achieved in two phases, with phase one completed by September 2014 and phase two, which will be a mirror image of the first phase completed by September 2015, both in time for the new academic year.

 

You can view an architectural fly through video of the building on You Tube by searching “Student Smart Accommodation Colchester”.

Latest

Bathroom Pod Install Complete at Plymouth Student Scheme

Pickstock Construction has completed install of all 60 Bathroom Pods into Block B at Crescent Point Student Accommodation scheme in Plymouth.   The shape of Block B dictated that Pickstock Construction would build it traditionally

READ MORE
modular construction contractors

Bathroom Pod Install Commences at Plymouth

The installation of 60 Bathroom Pods will commence this week at the student accommodation scheme, Crescent Point, in Plymouth.   The state of the art accommodation which is being built by Pickstock Construction utilising Elements

READ MORE
Room module

Plymouth Scheme Progresses to Module Install Stage

Pickstock Construction has received delivery of the first Room Modules to its student accommodation scheme in Plymouth’s City centre.   The site will provide Plymouth students with state of the art accommodation comprising of two

READ MORE